Construction Traffic Management Plan
Residential Development in Aberfeldie
RedSquare Traffic was engaged by a private builder to prepare a Construction Traffic Management Plan (CTMP) for the proposed residential development at 16 Valencia Street, Aberfeldie. The project involved the construction of a two side-by-side townhouses following the demolition of the existing dwelling. The project is expected operate for a period of further 18 months in two different stages i.e. Excavation and Construction.